  • Burgas is the largest city in South-East Bulgaria, hosting the biggest cargo harbor and one of the biggest airports in the country
  • The city is a major petrol and chemical industry center providing for 5.22% of the country’s GDP
  • 10 km to Burgas Airport
  • 4 km to Burgas harbor
  • 2 km to a Turkey-bound highway

 

Infrastructure

  • Electricity
  • Water and sewerage
  • Telecommunication network

General Characteristics

  • Total area: 238 000 sq.m
  • Industrial plots ranging from 2 000 to 30 000 sq.m
  • Density – 60%
  • Maximum height of construction – up to 20 m
  • Construction Intensity Coefficient – 2.0

Advantages

  • A first-class location with transport links in the immediate vicinity and well-developed infrastructure
  • Informational services
  • Administrative services
  • Investment incentives
  • State support for priority investment projects
  • Financial support for vocational training of employees
  • Complete infrastructure to the borders of the project site
  • Preferential treatment upon acquisition of real estate – private state or municipal property
  • Concentration of interrelated activities gathered in one place and overall efficiency increase
  • Doing business in a business environment with focus on financial, manufacturing and human resources
  • Improved access to international distribution channels and technology

 

Services

  • Industrial premises for sale or rent
  • Assistance in the issuance of all required documents and permits for the project implementation
  • Shortened administrative procedures
  • Professional attendance and consultations

Development stages

Stage I – completed

  • Road network and sidewalks with a total length of 1 750 m;
  • 4 power substations and an electricity line with 2 MW electrical supply capacity
  • 2 500 m electricity cable lines from the power substations to the individual plots;
  • Water supply pipeline with 27 extensions and shafts – a total of 2 000 m;
  • Sewerage system – 1 800 m;
  • Telecommunication lines – 2500 m;
  • Street lighting, green areas, fencing etc.;
  • Consolidation, drainage, water discharge

Stage II – to be completed by the end of 2015:

  • Road network with fortified foundation and sidewalks – total length of 3 000 m
  • 5 power substations;
  • Power cables from the power substations to the individual plots – 3 500 m;
  • Water supply pipeline with 30 extensions and shafts – a total of 3 400 m;
  • Sewerage system and waste water discharge – 3 100 m;
  • Telecommunication lines – 3 500 m;
  • Street lighting, green areas, fencing etc.